Atom Isı Enerji had carried out 120,000 m² superstructure construction of Gemlik Facility, which is the core of TOGG's 'Journey to Innovation' target and is defined as 'More than a Factory' with its functions gathered under the same roof and its smart and environmentally friendly features, with a total of 1,200,000 m²campus in a record time like 16 months.

 

We, Atom Isı, the mechanical installation solution partner of Yapı Merkezi as main contractor, have undertaken the construction works of heating, cooling, plumbing, ventilation, fire, mechanical automation, fire infrastructure, natural gas infrastructure and natural gas installations. In total, 35,000 m of steel pipe manufacturing, 1,600 m of steel natural gas infrastructure, 500 m of natural gas internal installation, 2,000 m of natural gas HDPE line and 10,000 m of fire infrastructure HDPE piping have been carried out. 

 

As a work that we pride in being a part of our country's favorite TOGG project, we have included it among our references.

 

Location: Gemlik/Bursa

OTHER PROJECTS

A PHP Error was encountered

Severity: Notice

Message: Trying to get property of non-object

Filename: includes/footer.php

Line Number: 33

Backtrace:

File: /var/www/vhosts/atomisienerji.com/httpdocs/en/application/views/includes/footer.php
Line: 33
Function: _error_handler

File: /var/www/vhosts/atomisienerji.com/httpdocs/en/application/views/projects-detail.php
Line: 133
Function: view

File: /var/www/vhosts/atomisienerji.com/httpdocs/en/application/controllers/Projects.php
Line: 47
Function: view

File: /var/www/vhosts/atomisienerji.com/httpdocs/en/index.php
Line: 318
Function: require_once

https://www.atomisienerji.com/en/yonetim/"target="_blank"> online katalog