Existing in-port liquid load terminal process piping, fire-fighting system piping construction works...
The construction job of 42,000 m of mechanical pipe installations belonging to the chemical storage tank farm investment carried out by Safi Holding in Derince Port in 2018 from the offshore discharge point to the transfer lines, from the tanker filling unit piping system to the fire-fighting system of the facility…
Finished Date:
Jun 2024
Category:
COMPLETED PROJECTS
Client: last
Place: DERINCE/KOCAELI